 | | Rethe Bridge Double-winged bascule bridge for road and harbor train Scope of supplies: design, manufacture and assembly of the steel construction, incl. corrosion protection Weight: 1100 t Client: Hamburg Port Authority Construction period: 2010-2012 Site: Hamburg, Germany |
| | | |
 | | Highway Bridges Bad Oeynhausen Road Bridges Scope of supplies: design, manufacture and assembly of the steel construction, incl. cables and corrosion protection Weight: 5665 t Client: Landesbetrieb Straßenbau NRW Construction period: 2009–2012 Site: Bad Oeynhausen, Germany |
| | | |
 | | Neckar Bridge Zwingenberg Road Bridge Scope of supplies: design, manufacture and assembly of the steel construction, incl. cables and corrosion protection Weight: 500 t Client: Community Zwingenberg Construction period: 2009–2011 Site: Zwingenberg, Germany |
| | | |
 | | Danube Bridge Tulln Railway Bridge Scope of supplies: design, manufacture and assembly of the steel construction, incl. corrosion protection Weight: 3700 t Client: ÖBB Infrastruktur AG Construction period: 2008–2009 Site: Tulln, Austria |
| | | |
 | | Hydro Power Plant Wallsee Scope of supplies: manufacture, corrosion protection and supply of the bottom gate Customer: VA TECH Hydro Client: Austrian Hydro Power Construction period: 2006–2007 Site: Wallsee, Austria |
 | | Stadium Tivoli New Innsbruck Scope of supplies: box girder framework supports with cantilever tribunes roofing Customer: Tivoli Neu-Arge Rhomberg/Wund Construction period: 1999 Site: Innsbruck, Austria |
| | | |
| | | |