Bilfinger BergerReferences

Division Steel Construction

  Rethe Bridge
Double-winged bascule bridge for road and harbor train
Scope of supplies: design, manufacture and assembly of the steel construction,
incl. corrosion protection
Weight: 1100 t
Client: Hamburg Port Authority
Construction period: 2010-2012
Site: Hamburg, Germany
 

 

     
Highway Bridges Bad Oeynhausen   Highway Bridges Bad Oeynhausen
Road Bridges
Scope of supplies: design, manufacture and assembly of the steel construction, incl. cables and corrosion protection
Weight: 5665 t
Client: Landesbetrieb Straßenbau NRW
Construction period: 2009–2012
Site: Bad Oeynhausen, Germany 

 

     


Neckar Bridge Zwingenberg
 

Neckar Bridge Zwingenberg
Road Bridge
Scope of supplies: design, manufacture and assembly of the steel construction, incl. cables and corrosion protection
Weight: 500 t
Client: Community Zwingenberg
Construction period: 2009–2011
Site: Zwingenberg, Germany 
     


Danube Bridge Tulln
 

Danube Bridge Tulln
Railway Bridge
Scope of supplies: design, manufacture and assembly of the steel construction, incl. corrosion protection
Weight: 3700 t
Client: ÖBB Infrastruktur AG
Construction period: 2008–2009
Site: Tulln, Austria 
     


Hydro Power Plant Wallsee
 

Hydro Power Plant Wallsee
Scope of supplies: manufacture, corrosion protection and supply of the bottom gate
Customer: VA TECH Hydro
Client: Austrian Hydro Power
Construction period: 2006–2007
Site: Wallsee, Austria 



Stadium Tivoli New Innsbruck
 


Stadium Tivoli New Innsbruck
Scope of supplies: box girder framework supports with cantilever tribunes roofing
Customer: Tivoli Neu-Arge Rhomberg/Wund
Construction period: 1999
Site: Innsbruck, Austria 
     
     
Competence in Steel Construction
PROFILE  |  TECHNOLOGIES  |  REFERENCES  |  CAREER  |  NEWS  |  CONTACTS
© MCE Stahl- und Maschinenbau GmbH & Co. KG | Imprint | Data protection information | Last update 16.05.2012