Bilfinger BergerReferences

MCE Nyiregyhaza

Highway bridge M43 Tisza bridge   Highway bridge M43 Tisza bridge
Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection
Weight: 1650 to
Client: Hídépítő Consortium
Construction period: 2009-2010
Site: Szeged / Hungary 
     
ÖBB Danube bridge Tulln   ÖBB Danube bridge Tulln
Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection
Weight: 2287 to
Client: MCE / ÖBB Infrastruktur AG
Construction period: 2008-2009
Site: Tulln / Austria
     


Viaduct M8 - Highway bridge
 

Viaduct M8 - Highway bridge
Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection
Weight: 704 to
Client: Bilfinger Berger
Construction period: 2008-2009
Site: Márkó / Hungary
     



Base frame for energy management

 

Base frame for energy management
Client: GE Energie
Qualification: Qualified supplier
Competence in Steel Construction
PROFILE  |  TECHNOLOGIES  |  REFERENCES  |  CAREER  |  NEWS  |  CONTACTS
© MCE Stahl- und Maschinenbau GmbH & Co. KG | Imprint | Data protection information | Last update 16.05.2012