![]() | Highway bridge M43 Tisza bridge Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection Weight: 1650 to Client: Hídépítő Consortium Construction period: 2009-2010 Site: Szeged / Hungary | |
![]() | ÖBB Danube bridge Tulln Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection Weight: 2287 to Client: MCE / ÖBB Infrastruktur AG Construction period: 2008-2009 Site: Tulln / Austria | |
![]() | Viaduct M8 - Highway bridge Scope of supplies: manufacture and assembly of the steel construction incl. corrosion protection Weight: 704 to Client: Bilfinger Berger Construction period: 2008-2009 Site: Márkó / Hungary | |
| | Base frame for energy management Client: GE Energie Qualification: Qualified supplier |







